Project Status:
Design starting soon.
Project Description:
Virginia Avenue and Daisy Street have been identified for street design changes to provide a safe and comfortable bicycle corridor that can be used by people of all ages and abilities.
This project will include the installation of various pedestrian and bicycle treatments consistent with a bicycle boulevard. These treatments include:
- Enhanced crossings (curb extensions or raised crossings at Virginia-Daisy at S.35th, S.38th, S.40th , S.41st , S.51st , S.54th trail crossing, and trail crossing east of S.57th
- 4 speed humps (various locations)
- Sidewalk infill (S.51st to S.52nd)
- Sidewalk infill (S.32nd to S.42nd, S.46th to trail crossing, S.51st to S.52nd )
- Shared pavement markings (S.32nd to S.42nd and S.46th to trail connection)