B21005 – ‘G’ Street – 10th St. to 23rd St. (2024 GO BOND)
Project Status:
Design is starting soon.
Project Description:
‘G’ St from the 10th St to 23rd St is a major collector on the south side of McKenzie-Willamette hospital in a residential area and is one of six projects funded by the 2024 GO Bond. ‘G’ St was chosen for repair because the pavement is quickly deteriorating and, if left much longer, would require full reconstruction. This project will extend the useful life of ‘G’ St. and consists of a mill and pavement overlay and ADA upgrades to existing ramps, driveways, and signals. It will also include upgrades to ADA ramp at Marylhurst Park at 18th and ‘H’ Streets.